ZADCO South Island – Sea Water Supply for Drilling Operations
The project
Overview
The system was designed by ACTION and ACTION technicians and operators were used for the duration of the project.
The system was installed and commissioned in line with HLG guidelines.
4,000 gpm
Maximum system flow rate
24h period
Operation per day
~1 Year
Operating duration
The requirement
Project challenge
Cost effective solutions, Monitoring team, Dry platform for the main contractor to work in at all times
Ensure the safety of the contractor’s equipment and staff working within the excavation, maximum flow requirement.
The response
ACTION solution
On site




