ZADCO South Island – Sea Water Supply for Drilling Operations

The project

Overview

The system was designed by ACTION and ACTION technicians and operators were used for the duration of the project.

The system was installed and commissioned in line with HLG guidelines.

4,000 gpm

Maximum system flow rate

24h period

Operation per day

~1 Year

Operating duration

Project at a glance

Location:

Service:

Asset:

Power supply system, The pump units

Scope:

The supply and operation of a water winning system on the South Island, The system was designed by ACTION and ACTION technicians.

The requirement

Project challenge

Cost effective solutions, Monitoring team, Dry platform for the main contractor to work in at all times

Ensure the safety of the contractor’s equipment and staff working within the excavation, maximum flow requirement.

The response

ACTION solution

  • Excavate for pipeline installation
    Installation, commissioning, and maintenance of a dewatering operation.

  • Pipeline supply & power supply
    Two centrifugal pumps and three submersible pumps, break tank, pipe network, and associated fittings

  • Maintenance, monitoring
    An engineered solution in terms of design, installation, operation routine mainatnence and pump replacement with no downtime.