Jeddah Stormwater Drainage – Excavation & Dewatering

The project

Overview

Design, supply, installation, commissioning, and maintenance of a dewatering operation

ACTION engineered a sump pumping system consisting of a combination of high- and low-capacity electrical sump pumps from Mody Pumps (models 902-1002), along with power supply systems and discharge networks

600,000m3/Day

Maximum system flow rate

600K/Cubic Per M

Operation per day

~24/7

Operating duration

Project at a glance

Location:

Service:

Asset:

Twin 1,000mm diffuser pipes, high-capacity pumps

Scope:

Hypersaline water pumping · Transferring over 5.5 million cubic meters of hypersaline water.

The requirement

Project challenge

Design, supply, installation, commissioning, and maintenance, pipeline installation

24/7 continuity of dewatering works and to ensure the safety of the contractor’s equipment and staff working within the excavation

The response

ACTION solution

  • Excavate for pipeline installation
    Installation, commissioning, and maintenance of a dewatering operation.

  • Pipeline supply & power supply
    250 pumps installed. Excavations was 21km

  • Maintenance, monitoring
    ACTION established a workshop on site to further streamline the maintenance and repair of equipment with Mody Pumps

On site

Project gallery

Talk to ACTION

Let’s solve your operating challenge

Share your site conditions, performance requirement and schedule. The ACTION team will help define a practical route forward.