Hydrocarbons introduced into a line that still holds air or moisture create a fire and corrosion risk, and can form hydrates. Purging and inerting with nitrogen reduces that risk to the oxygen and moisture levels set in the specification, ready for start-up. ACTION does this with nitrogen generated on site.