As early as possible, before excavation depths, construction sequences and retention methods are finalised.
Early groundwater assessment helps shape the design, avoid costly changes and keep the programme moving. Ideally it starts while the site investigation is still being scoped, so the boreholes include the permeability and groundwater data the design will need.