Dubai Municipality Sewage Overpumping

This scope involved the sewage overpumping of a maximum of 3,700m3/hr from an existing manhole to a newly installed wet well chamber by using suitable lengths of 315mm, 355mm and 450mm HDPE discharge pipes. Each pumping operation took 10 days of continous operations, with multiple suction points on the network being carried out sequentially.

Action supplied a spread of medium head and high flow pumps which were engineered to provide optimal performance and varied duty points (depending on the manhole) with the maximum pressure required being 8.5 bar. HDPE line was installed for the discharge. The project lasted approximately 3 months in total.

Project Gallery

Headquarters

Action International Services LLC

Dubai Investments Park - 1

P. O. Box 86987

Dubai

United Arab Emirates

Dubai (+971) 4814 9300  Abu Dhabi (+971) 4814 9498  Muscat (+968) 9721 0013  Doha (+974) 4496 0100  Dammam (+966) 1380 86137 Jeddah (+966) 122 894 177 

Manama (+973) 1742 2011  Kuwait (+965) 9551 9429

©2020 by Action International Services LLC

bottom of page